Can I Change The Budget Of An Ongoing Campaign In SoCast Reach To Leverage The Learned Algorithm?
Yes, you can change the budget of an ongoing campaign in SoCast Reach to leverage the learned algorithm, as long as the campaign goals (such as awareness, consideration, or conversion) remain consistent. Adjusting the budget will allow you to utilize the data and optimizations the algorithm has already built for the campaign. However, please note that very low budgets may limit the algorithm's ability to learn effectively.
Related Articles
How Do I Transfer Remaining Budget From An Ending SoCast Reach Campaign To A New Campaign?
To transfer the remaining budget from an ending SoCast Reach campaign to a new campaign, follow these steps: Confirm the end date of your current campaign with the SoCast Ad Support team. Request the remaining budget amount from Ad Support after the ...
How Is The Media Budget Calculated In SoCast Reach Campaigns?
To calculate the media budget for a campaign in SoCast Reach, use the following formula: Media Budget = Total Budget / (1 + Markup Percentage) For example, if your total campaign budget is $900 and your markup is 275%, the calculation would be: Media ...
How Do I Present Multiple Budget Options in SoCast Reach?
Log in to SoCast Reach. Navigate to the campaign you wish to extend. To present multiple budget options to your client, you have two choices: Option 1: Clone your current campaign and add a second line item with the alternative budget (e.g., ...
What Is The Minimum Budget Requirement For TrueReach Campaign Line Items In SoCast Reach?
For TrueReach campaigns in SoCast Reach, each line item must have a minimum media cost of $250. This means that the client-facing minimum should be $500 per line item. It is recommended to structure campaigns with two line items (for example, Social ...
How Do I Clone An Existing Campaign In SoCast Reach?
Log in to SoCast Reach. Navigate to the campaign you want to duplicate. Click on the campaign to open its details. Click the "Clone Campaign" button. Update the start and end dates, budget, or any other details as needed. Resubmit the campaign. ...